Request a demo

Take the desk.

Try the Room 214 handoff in this sample check-in.

A housekeeper lifts a blue-striped pillow above the bed.

The last pillow.

The bed is made. Let reception know Room 214 is ready for its next guest.

Room 214 Being prepared

Housekeeping · 1 of 3

Move the bookings before you move the desk

A cutover checklist for open reservations, balances and sales channels, with a sign-off template.

A supervisor moves a reservation card to the new room file.

When should the old PMS stop taking changes?

Choose a cutover window using the arrivals and departures list. Agree on a final export time, the person who can pause the switch and where staff will record changes in the gap. Include bookings received by phone, room moves and same-day cancellations. Give staff a lead for each shift and one authorised record to use until the new property management system opens.

Which bookings and balances should be reconciled?

Match room types, rate plans and references before the test import. Compare counts by arrival date for future bookings. For in-house guests, match each assigned room, departure date and open folio. Reconcile deposits and balances separately by currency. Check a partially paid booking and a cancelled stay with a remaining credit. A matched reservation count can still hide a missing deposit or two offsetting errors.

Illustrated import reconciliation showing 24 bookings and $600 in deposits both before and after migration.

How do you handle a change after the final export?

Suppose the last export runs at 13:00 and a guest extends their stay in Room 214 at 13:12. Record the reference, old and new departure dates and any resulting charge in the change log. After import, apply the extension once, then verify availability for the extra night and check whether another arrival was already assigned to the room. Mark the entry reconciled and record who reviewed it.

What should a channel test cover?

Test a fresh reservation, a date change and a cancellation for each connection using an agreed testing method. Verify the room and rate mapping, booking reference and availability for the dates affected by each action. Check where the confirmation reaches staff. Use the worksheet’s result and evidence columns to capture the test booking and the name of the person who saw the expected outcome.

Illustrated inventory view showing no twin rooms left on either the direct or travel agency channel.

What should delay reopening inventory?

Set hold criteria before cutover. An unmatched in-house balance or a channel still delivering bookings to the old system should trigger review by the cutover lead. Keep approved source records accessible during the agreed transition. At sign-off, give the incoming desk the system to use, the opening time, any approved exceptions with owners, and the location of the reconciled change log.

The front desk

Stayclouds automated guide

What can I help you with at the desk today?